The Austrian capital, Vienna, is growing relentlessly, and with it, the demand for efficient transportation solutions. As part of the expansion of the urban rail network, Viennese tunnel construction is in full swing. Groundbreaking technology has proven to be a true revolution in the field of tunnel work: the RR9-200 from Platform Basket. The German company KUNZE has made a name for itself with its innovative product produced by the Italian manufacturer, and the company INEO UTS is successfully using this machine in the construction of a new underground railway line.
RR9-200 in detail
The RR9 is a versatile and powerful railroad platform, specifically designed for demanding applications such as tunnel construction. It is characterized by its high load capacity, range, and flexibility, thus enabling efficient work in confined spaces. The RR9 can be used on both rails and roads, making it a valuable tool for use in tunnel construction.
Use of the RR9 by INEO UTS
NEO UTS, a renowned provider of technical solutions and services, has employed the RR9 from SYSTEM LIFT Kunze in Viennese tunnel construction to increase work efficiency and safety. The company INEO UTS chose the RR9 as it represents an ideal solution for the specific requirements of tunnel construction.
Advantages of the RR9 in tunnel construction
The RR9 offers many advantages that make it an indispensable helper in tunnel construction. These include, among others:
- High load capacity: The RR9 can carry loads of up to 200 kg, simplifying the transport of personnel and materials.
- Large reach: The work platform achieves a maximum working height of 9 meters, allowing for access to hard-to-reach areas within the tunnel.
- Flexibility: The RR9 can be used on both rails and roads, expanding its applications in tunnel construction.
- Safety: The RR9 is equipped with state-of-the-art safety features to minimize the risk of workplace accidents.
INEO UTS contact person, Mr. Konjevic, who also accompanied the introduction of the machine into the subway shaft using a crane from Felbermayr and received on-site training from KUNZE AT branch manager Robert Spari, commented on this milestone:
"The successful integration of the RR9 railway platform from SYSTEM LIFT Kunze into our tunnel construction projects demonstrates how much innovation and teamwork contribute to the success of such complex endeavors. The collaboration with Mr. Spari and the Felbermayr company in introducing the machine into the subway shaft and the subsequent training went smoothly. We are proud to be able to make Viennese tunnel construction more efficient and safer with such reliable partners and state-of-the-art technology. The RR9 is a valuable tool that helps us successfully manage the growing traffic infrastructure demands."